An Example of Our Structural Buildings and Slab Expertise
Undertaken next to a live rail corridor, this photo shows our team crane lifting the new rail signalling control room on top of the structural slab was installed. We subsequently lifted and installed the communications pole adjacent to the building structure, then installed and connected the new switchboard, hauled the communications cable, installed and connected the heating and cooling for the control room.
All works were undertaken adjacent to a live rail corridor, with strict standards, procedures and protocols. We were required to complete all works ready for the VicTrack – Downer Rail systems engineers to cut over the old rail signalling network to this new control room system.